Anritsu SM7060

0.8 mm (f) to WR6 Adapter

Open Market / 6 Weeks

Anritsu 28.8F50

0.8 mm Termination; DC to 145 GHz; 0.8 mm (f); 50 Ohm

Open Market / 6 Weeks

Anritsu 01-524

Torque Wrench; 0.45 Nm (4lbfin) for 0.8mm connectors

Open Market / 6 Weeks

Anritsu 2000-1791-R

Isotropic Antenna; E-Field; 0.7 GHz - 6 GHz

Open Market / 6 Weeks

Anritsu 28.850

0.8 mm Termination; DC to 145 GHz; 0.8 mm (m); 50 Ohm

Open Market / 6 Weeks

Anritsu 01-525

End Wrench; 0.8 mm - 6x7 mm

Open Market / 6 Weeks

Anritsu 806-389-R

Cable; SMB(m)/SMB(m); 0.9m (For MA244XXA USB Peak Power Sensor)

Open Market / 6 Weeks

Anritsu MU100011A-073

CPRI 12/25G Single Channel

Open Market / 6 Weeks

Anritsu J1795A

Coaxial Cable (SMA(M)-SMA(M); 0.5m)

Open Market / 6 Weeks

Anritsu J1795B

Coaxial Cable (SMA(M)-SMA(M); 1.0m)

Open Market / 6 Weeks

Anritsu MU100011A-074

CPRI 12/25G Dual Channel

Open Market / 6 Weeks

Anritsu J1795E

Coaxial Cable (SMA(M)-SMA(M); 3.0m)

Open Market / 6 Weeks

Anritsu 806-390-R

Cable; BNC(m)/SMB(m); 0.9m (For MA244XXA USB Peak Power Sensor)

Open Market / 6 Weeks

Anritsu J1795D

Coaxial Cable (SMA(M)-SMA(M); 2.0m)

Open Market / 6 Weeks

Anritsu 2000-1760-R

GPS Antenna; SMA(m); 25 dB gain; requires 2.5 VDC to 3.7 VDC

Open Market / 6 Weeks

Anritsu MU100011A-373

CPRI 12/25G Single Channel Retrofit

Open Market / 6 Weeks

Anritsu MU100011A-374

CPRI 12/25G Dual Channel Retrofit

Open Market / 6 Weeks

Anritsu ND68797

Option 2 2 MHz Low Frequency Extension Retrofit Option for S8X0D

Open Market / 6 Weeks

Anritsu S412E-3027

Option 27 Retrofit; Channel Scanner for S412E

Open Market / 6 Weeks

Anritsu MT8212E-3027

Retrofit: Channel Scanner for the MT8212E

Open Market / 6 Weeks

Anritsu MX800030A-TL020

NR DCI Format 0_2/1_2

Open Market / 6 Weeks

Anritsu MS2090A-8027

Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu 33.8G50

MA25400A flange interface to 0.8 mm (male) adapter

Open Market / 6 Weeks

Anritsu MS2090A-3027

Channel Scanner

Open Market / 6 Weeks

Anritsu MS27201A-0027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu S362E-3027

Option 27 Retrofit; Channel Scanner for S362E.

Open Market / 6 Weeks

Anritsu MT8213E-3027

Retrofit: Channel Scanner for the MT8213E

Open Market / 6 Weeks

Anritsu S332E-3027

Option 27 Channel Scanner Retrofit

Open Market / 6 Weeks

Anritsu 14RKFK50-1.0

Test Port Extension Cable; Armored; Flexible; 1.0 meter; DC to 40 GHz;...

Open Market / 6 Weeks

Anritsu MS2089A-9027

Option 27; Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu 14RKFK50-0.6

Test Port Extension Cable; Armored; Flexible; 0.6 meters; DC to 40 GHz;...

Open Market / 6 Weeks

Anritsu MD8190A-091

0.4-6GHz RX RF Unit

Open Market / 6 Weeks

Anritsu MS2090A-0027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu MS2090A-9027

Option 27; Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu MS2720XA-3027

Channel Scanner

Open Market / 6 Weeks

Anritsu MS2080A-9027

Option 27; Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu MS2070A-0027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu MS2070A-3027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu MS2080A-3027

Channel Scanner

Open Market / 6 Weeks

Anritsu 14KFK50-0.6

Test Port Extension Cable; Armored; Flexible; 0.6 meters; DC to 40 GHz; K(f) -...

Open Market / 6 Weeks

Anritsu 14KFK50-1.0

Test Port Extension Cable; Armored; Flexible; 1.0 meter; DC to 40 GHz; K(f) -...

Open Market / 6 Weeks

Anritsu 14KFKF50-0.6

Test Port Extension Cable; Armored; Flexible; 0.6 meters; DC to 40 GHz; K(f) -...

Open Market / 6 Weeks

Anritsu MS2089A-0027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu MX800030A-020

NR DCI Format 0_2/1_2

Open Market / 6 Weeks

Anritsu MS2089A-3027

Channel Scanner

Open Market / 6 Weeks

Anritsu MS2089A-8027

Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu MS2070A-8027

Option 27; Channel Scanner (90 day time limited)

Open Market / 6 Weeks

Anritsu MS2070A-9027

Option 27; Channel Scanner (90-day time limited)

Open Market / 6 Weeks

Anritsu MS2080A-0027

Option 27; Channel Scanner

Open Market / 6 Weeks

Anritsu MS2080A-8027

Channel Scanner (90-day time limited)

Open Market / 6 Weeks